Oil and Gas
Jafurah GPF Project (JFGP1)
Samsung Saudi Arabia
Saudi Arabian Oil Company (Saudi Aramco)
Jafurah, Kingdom of Saudi Arabia
One of the massive unconventional non-associated gas field in the Kingdom of Saudi Arabia. Jafurah gas field project located in southeast of the Ghawar oil field and contains approximately 200 trillion cubic feet of liquid gas resources.
ARCC scope of work includes the following:
Debottleneck Onshore Plant Safaniyah
Engineering for the Petroleum and Process Industries (ENPPI)
Saudi Arabian Oil Company (Saudi Aramco)
Safaniyah, Kingdom of Saudi Arabia
The main objective of this project is to ensure Safaniyah Onshore Plants will meet and maintain the forecasted crude oil rates at Maximum Sustainable Capability. This will be met by increasing the Arab Heavy Crude processing capacity from 1,200 MBCD to 1,300 MBCD and the produced Water Handling Capacity from 810 MBCD to 1,500 MBCD.
ARCC scope of work includes the following:
Fire Protection for Sulfur & Storage Facilities
Saudi Arabian Oil Company (Saudi Aramco)
Jazan, Kingdom of Saudi Arabia
The purpose of this project is to provide Fire Protection System for Terminal Sulfur and Stacker Reclaim Building (TSSRB) and Belt Conveyor area in the Sulfur Forming Unit of Marine Terminal Facilities in Jizan.
The facility shall be provided with a fire protection system as per classification stated in the Saudi Aramco Building Code (SAES-M-100) and addressable fire detection / alarm system. The fire protection, detection and alarm system shall comply with all relevant NFPA Standards. The fire alarm system shall be interfaced with the local HVAC plant shutting down designated systems in the event of a fire within the building. A remote alarm signal shall also be generated for site-wide monitoring of the building fire condition.
ARCC scope of work includes the following:
Hawiyah Unayzah Gas Reservoir Storage Project (HUGRS)
Samsung Saudi Arabia Co., Ltd. (SSA)
Saudi Arabian Oil Company (Saudi Aramco)
Hawiyah, Kingdom of Saudi Arabia
Saudi Aramco’s Hawiyah Unayzah Gas Reservoir Storage (HUGRS) will introduce surplus sales gas into existing well during winter and reproduce gas to match the increase in demand in the summer. Its facilities includes Gas Injection Facility with a capacity of 1.5 million standard cubic feet per day (MMSCFD) and a Gas Reprocessing Facility of 2 million standard cubic feet per day (MMSCFD).
ARCC scope of work includes the following:
Dewatering System & Oily Water Sump Pits
Saudi Arabian Oil Company (Saudi Aramco)
Abqaiq, Kingdom of Saudi Arabia
The purpose of this BI-10-00934 is to restrict the release of flammable hydrocarbon liquids and sour oily water during normal operation and turnaround and inspection (T&I) activities into the general sewers and oily water lift stations which releases H2S and flammable vapor mixtures into the surrounding areas and places the facility under the risk of fire and pollution.
The aim of this project is to control the safety and environmental risks at the industrial drainage and dewatering systems in line with Corporate Objectives of intensifying the focus on safety and protection of the environment.
ARCC's scope includes civil and structural to carry out modifications to existing 18 nos. Oily Water Lift Stations at various plants and construction of 2 new Oily Water Lift Stations at Plant 64A & 102, piping, mechanical and electrical & instrumentation works.
ARCC scope of work includes the following:
Abqaiq Plant Restoration Project CRPO
Saudi Arabian Oil Company (Saudi Aramco)
Abqaiq, Kingdom of Saudi Arabia
Abqaiq Plant Restoration Project (CRPO) are additional works to the existing restoration project that is composed of the following BI's:
ARCC's scope includes civil and structural, piping, mechanical and electrical & instrumentation works.
Petrochemical
APOC PDH/UTOS Project
Samsung Saudi Arabia
Advanced Polyolefins Industry Company (APOC)
Al Jubail, Kingdom of Saudi Arabia
ARCC scope of work includes the following:
Power and Desalination
Shuaiba Phase-1 Dessalination Plant
Rawafid Industrial Company Ltd. and Advanced Water Technology Company Ltd.(RAC)
Saline Water Conversion Corporation
Shuaiba, Kingdom of Saudi Arabia
Shuiaba Desalination Plant Technology and Expired Assets Replacement Project consists of a new seawater desalination plant with RO desalination technology and a potable water production capacity of 600,000 m3/d.
ARCC scope of work includes the following:
Shuaiba Desalination Plant Technology and Expired Assets Replacement Project - Supply and Installation of EOT Cranes
Rawafid Industrial Company Ltd. and Advanced Water Technology Company Ltd.(RAC)
Saline Water Conversion Corporation
Shuaiba, Kingdom of Saudi Arabia
ARCC scope of work includes the following:
Refinery
Expand VDU Unit Heater Capacity at Riyadh Refinery
Saudi Arabian Oil Company (Saudi Aramco)
Riyadh, Kingdom of Saudi Arabia
Vacuum Gas Oil (HVGO) product was caused by improper location of Crude Distillation Unit (CDU) overflash feed nozzle to Vacuum Distillation Unit (VDU). This leads to Diesel limitation and lower throughput by 8 MBD. Therefore rerouting to Vacuum Heater Z09-F-0101 is required. HOwever, Vacuum Heater is exceeding design limit with shorter run length of 2- 2.5 years due to excessive coke formation, which eventually leads to tubes high skin temperature.
ARCC scope of work includes the following:
Shutdown & Turnaround
Yansab Olefins Plant – Furnace 8 (F-1180)
Yanbu National Petrochemical Company (Yansab)
Yanbu, Kingdom of Saudi Arabia
The Convection Section Upgrade is intended to overcome the draft limitations caused by burning low H2 contents fuel which generates higher flue gas flow rates at same furnace. The Convection Section was re-designed to process Fresh Ethane Feed at 18.4 t/a and high pressure steam production at 22 t/h and with flexibility to support the future installation of Feed Saturator. The upgrade is based on the recommendation of OEM (Technip Energies) wherein the inspection is conducted on 10~11 August 2021.
ARCC scope of work includes the following:
Yansab Oil Water Separator Improvement
Yanbu National Petrochemical Company (Yansab)
Yanbu, Kingdom of Saudi Arabia
The existing Oil Water Separation facility V-1201 is under performance due to low residence time. Yansab has decided to implement this project that will provide the necessary modifications required to improve the Oil Water Separation efficiency in Vessel V-1201 at the upstream of DOX Unit in Unit 12.
ARCC scope of work includes the following:
Yansab Furnance Retubing Services
Yanbu National Petrochemical Company (Yansab)
Yanbu, Kingdom of Saudi Arabia
The work scope is replacement of tubes (160 nos.) and nozzle (40 nos.) of Furnance Unit No.1