A joint venture of Al Rushaid Petroleum Investment Company and EEI Corporation

Al Rushid Construction Co., Ltd. (ARCC) is a joint venture of Al Rushaid Petroleum Investment Company (ARPIC) and EEI Corporation from the Philippines. Established in 1993, the company has grown to become one of the leading construction companies in the Oil & Gas, Energy and Water, Petrochemical, Industrial and Manufacturing industry.

Over the years, ARCC has been involved in the major development in the kingdom of Saudi Arabia for the construction of Refineries and Petrochemical Plants, Power and Desalination Plants, Mining and Industrial Facilities.

Board of Directors

RASHEED A. AL RUSHAID

Chairman

HENRY D. ANTONIO

Director

CRIS NOEL E. TORRES

Director

ROBERT YOE

Director

General Manager

ROMUALDO L. CANLAS

General Manager (OIC)

Construction

ARCC has been in the construction business in the Kingdom of Saudi Arabia for over 30 years. While this accounts to its local tenure, the management and the track record of the company originated from Philippine venture company, EEI Corporation with over 90 years of existence in the global construction business.

ARCC is operated by seasoned Management Team and highly skilled craftsmen whose experiences in construction have been passed on from several generations. ARCC takes pride in the dedication and passion of its people, committed to pursue excellence and live up to its vision to be the Contractor of Choice in the kingdom.

The development philosophy of ARCC is straightforward. Our mission is to provide the highest performance on Safety, Quality and Commitment, and maintain integrity and fairness in dealing with our Clients, Vendors and Employees. Our principle is also to keep up with our high standards of Field Engineering Services in every undertaking, not only to lead the industry but to seek for new heights and advancement.

Our civil construction capability includes:

  • Earthworks/Siteworks/Roadworks
  • Pipe Rack and Foundation
  • Building
  • Fireproofing
  • Waterproofing
  • HDPE Lining
  • Architectural

Steel Structure

  • Structural Steel Erection / Modification
  • Modularization
  • Painting Works
  • Galvanizing Works
  • Fireproofing Works
  • Grouting Works

Mechanical Works

  • Vessel/Column/Drums
  • Furnace/Boilers/Fired Heaters
  • Heat Exchangers
  • Compressors
  • Equipment Internals
  • Pumps/Valves
  • Fin Fan/Air Coolers
  • Conveyors
  • HVAC

Piping Works

  • Spool fabrication (Carbon Steel, Stainless Steel, Alloy, Inconel, Cladded, etc.)
  • Installation, repair, modification
  • Tie-in
  • Valve testing
  • Post Weld Heat Treatment (PWHT)
  • Positive Material Identification (PMI)
  • Torqueing / Tensioning Works

Electrical and Instrumentation Works

Installation, testing and commissioning of electrical & instrument equipment:

  • Transformers, Switchgears, Switchboards, Panel Boards, Switch Racks, MCC, ATS, MDB, Bus Ducts, Cables, Battery, UPS System
  • Cable Laying, Splicing, Termination, Joints and Testing
  • Protection and Control Panel
  • Automation and System Integration (DCS, ESD, PLC)
  • Instrumentation and Controls (Installation, Loop Check, Testing & Calibration)
  • Testing and Commissioning of Instruments and Control Loops
  • Leak Testing
  • Inspection and Survey

Shutdown, Turnarounds Projects and Plant Maintenance Services

Installation, removal, repair and modification:

  • Furnace/Boilers/Fired Heaters
  • Modification of Vessels, Reformer, Boiler, Furnace, Heater, Exchanger, etc.
  • Testing and Pre-commissioning and Assistance in Commissioning Works
  • Structural Steel Erection / Modification Works
  • Electrical and Instrumentation Works
  • Civil Works (including disposal of ‘dewatered water)
  • Cathodic Protection
  • Fabrication and Erection of Pipes
  • Demolition Works (HT Crossovers, Radiant Tubes, Convection Tubes, Pigtail Box, Radiant Floor, Burner, Radiant Arch, etc.)
  • Equipment Erection / Modification Works (Note: Modification as per ASME Stamp PP - Fabrication and Assembly of Pressure Piping ASME Stamp S - Manufacture of Boiler Parts ASME Stamp A - Assembly of Power Boilers ASME Stamp U - Manufacture of Pressure Vessels NBBI Authorization Stamp NB NBBI Authorization Stamp R – Metallic Repair and Alteration)
  • Vessel/Column/Drums
  • Heat Exchangers
  • Compressors
  • Equipment Internals
  • Pumps/Valves
  • Fin Fan/Air Coolers
  • Conveyors
  • HVAC
  • Insulation Works
  • Refractory Works
  • Painting Works
  • Scaffolding Works
  • Tie-in Works
  • NDE Works
  • Fireproofing
  • Chemical Cleaning

Certifications

Safety & Environment Management System

American Society Of Mechanical Engineers

Quality Management System

National Board of Boiler and Pressure Vessel Inspectors

Non-General Bid Slate - Specialised Scaffold Certification